Farmington’s zoning commission will hear a proposal Monday for a 237-unit riverfront community that would convert a dormant sand-and-gravel quarry into housing, with the developer projecting a $1.65 million annual net benefit for the town.
Already a Subscriber? Log in
Get Instant Access to This Article
Subscribe to Hartford Business Journal and get immediate access to all of our subscriber-only content and much more.
- Critical Hartford and Connecticut business news updated daily.
- Immediate access to all subscriber-only content on our website.
- Bi-weekly print or digital editions of our award-winning publication.
- Special bonus issues like the Hartford Book of Lists.
- Exclusive ticket prize draws for our in-person events.
Click here to purchase a paywall bypass link for this article.
The applicant is asking the commission to amend the town’s Plan of Conservation and Development, revise the Mid-Point Development District regulations and rezone the parcels from their current business restricted, senior/active adult, residential and earth excavation designations to the Mid-Point district, which allows mixed-use residences. If the master plan is approved, a detailed site plan application would follow.
Attorney Robert Reeve of Unionville-based Scully, Nicksa & Reeve, who filed the application in April, wrote that the project responds to strong demand in Farmington for more diverse housing types amid demographic shifts away from large single-family homes. He said the dormant quarry parcel would be "rehabilitated to a productive and aesthetically pleasing use."
Planned amenities include a clubhouse, riverside gazebos, kayak and canoe storage, picnic areas and walking trails that would allow a future connection to the Farmington River Canal Trail. Interior roads would link Bridgewater Road with Central Way and Melrose Drive, a connection the town has long sought to improve traffic circulation near Route 4.
All construction would be set back at least 100 feet from the river, and a portion of the site would be conveyed to the town or preserved through a conservation easement.
A fiscal impact study prepared by Goman+York Property Advisors estimates the development would generate about $2.54 million in combined annual revenue for the town against $895,459 in expenditures, for a net annual benefit of roughly $1.65 million. The developers would also pay an estimated $1.1 million in one-time permitting and development fees.
The project, estimated to cost about $225 million, was first reviewed informally by the zoning commission in June 2025.